日産スタジアム NISSAN STADIUM (2024)

Ideal viewing

Ideal playing conditions

Ideal news reporting facilities

Friendly to people and the environment

Overview

Overview of the facility

Events Track and field, football, rugby, American football, cultural and entertainment events, and others
Track Class-1 certified all weather track: 400m x 9 lanes, Urethane surface
Field Natural grass (107 x 72m)
Spectator seats 2 tiers (all seats with back supports)
Capacity 72,327 (34,371 in the Lower Stand, 37,956 in the Upper Stand)
Nighttime event illumination Approx. 1,500-lux (2,000-lux in front of goals)
Large screens 2 units, Size: 19 x 9m (837 inches)
Air running hi-vision camera Travels 100m in 7 seconds
Broadcasting booths 10
Parkings for TV relay vehicles 8 cars (for 2 TV stations)
TV camera installation points 20 locations

Ideal viewing

With 72,327 seats, the stadium has the largest spectator capacity in Japan. All the seats are individually sectioned with 90cm of space between rows, so spectators can sit back and enjoy the games in comfort. To ensure that spectators do not miss any of the drama, large screens are installed on both Side Stands for instant replays of outstanding plays and scores. Additionally, the sound coming from the 528 loudspeakers adds emotion and excitement to the game. Three quarters of the seating area is covered by a large roof.
With 72,327 seats, the largest in Japan
日産スタジアム NISSAN STADIUM (1) All the seats are individually sectioned with 90cm of space between rows.
日産スタジアム NISSAN STADIUM (2) There are drink holders on each seat and railings on all the stairways.
 Lower Stand
Two large screens
日産スタジアム NISSAN STADIUM (4) 2 large screens of 19 x 9m are installed on both Side Stands.
日産スタジアム NISSAN STADIUM (5) The dynamic image on the screen can be viewed from all the seats.
 Large screen
The first air running hi-vision camera in the world
日産スタジアム NISSAN STADIUM (7) Able to travel 100 meters in seven seconds, it can move with athletes and provide dynamic scenes of their play.
 Air running hi-vision camera
Unification of the seats and the field
日産スタジアム NISSAN STADIUM (9) The Upper Stand overhangs the Lower Stand by 10m, thereby reducing the distance between the seats and the field.
日産スタジアム NISSAN STADIUM (10) The Upper Stand has an incline of 30 degrees to give the spectators the best possible view.
日産スタジアム NISSAN STADIUM (11) The front row is positioned 75cm above the level of the field to give spectators a ringside seat for watching the track and field competitions at the same level as the athletes.
 Back stand
528 constant directivity loudspeakers
日産スタジアム NISSAN STADIUM (13) The speakers have been distributed so as to obtain the best sound quality possible.

Ideal playing conditions

Our greatest pride is of course, the natural grass. The groundskeepers work hard throughout the year to keep the grass in top condition for playing and take extreme care in planting summer and winter grasses. Other characteristics of the stadium include the positioning of the lights placed to avoid the formation of shadows of the players and the reduced wind effect, thanks to the roof that covers three quarters of the spectator seats.
The secrets of an evergreen grass
日産スタジアム NISSAN STADIUM (14) There is a structure similar to a flowerpot at the depth of 80cm under the grass, and under it there is a hollow space.
日産スタジアム NISSAN STADIUM (15) At the depth of 30cm, there are pipes of hot water that help to regulate temperature.

 Cross-section of the ground   Grass
Athletes and spectators at the same level
日産スタジアム NISSAN STADIUM (18) The front row is situated 75cm above the level of the field so that the athletes sense the spectators near them.(generally 2m)
 Field and stand
Illumination system made up of 824 lamps
日産スタジアム NISSAN STADIUM (20) The lights are placed so as to avoid the formation of shadows of the players.
日産スタジアム NISSAN STADIUM (21) In professional football, the nighttime lighting is 1,500-lux, 2,000-lux in front of the goals.
 Night game lighting
Reduced wind effect
日産スタジアム NISSAN STADIUM (23) The roof covering three quarters of the spectators' seats considerably reduces the effect of the wind.
 Roof

Ideal news reporting facilities

There are coaxial and optical fiber cables installed among the broadcast rooms, the relay van parking and the parabolic antenna site in order to make any radio or TV broadcasts possible without the need for wiring the facilities. The 288 seats for press are protected from the rain by a movable roof, and it is possible to send and receive data by connecting faxes and computers to the jacks provided. Additionally, and responding to the demands of the press companies, we have been improving the information infrastructure to make it even easier and more practical to use.
Rich information structure
日産スタジアム NISSAN STADIUM (25) Besides ideal camera positions to capture the best of the football and athletics competitions, there are coaxial and optical fiber cables installed among the broadcast rooms, in the production compound and in the parabolic antenna site.
日産スタジアム NISSAN STADIUM (26) There are coaxial cables for electrical microwave transmission between the highest part of the stand and the production compound for satellite transmission.
日産スタジアム NISSAN STADIUM (27) It is possible to send and receive data by fax or computer on all the 288 press seats.
 Press seats
Interview room with capacity of 350
日産スタジアム NISSAN STADIUM (29) Besides a press lounge and rooms for the press, there is an interview room accommodating 350 journalists at a time.
 Interview room
Movable roof
日産スタジアム NISSAN STADIUM (31) With a total length of 146m, it has a movable and a static part.
日産スタジアム NISSAN STADIUM (32) It can extend to as much as 5.5m, covering all of the press and VIP seats.
 Movable roof

Friendly to people and the environment

There are 147 permanent seats for wheelchairs. If necessary, it is possible to have as many as 632 wheelchair places using seats designed specially for this purpose. Water for flushing the toilets and other facilities is a combination of rainwater collected from the roof and treated and recycled waste water. The roof and the walls are fitted up with sound-absorbing panels and all the lights are placed under the roof so as to avoid the emission of light to the outside.
147 permanent seats for wheelchairs
日産スタジアム NISSAN STADIUM (34) 485 general seats can also be converted temporarily for use with wheelchairs.
 Wheelchair space
Recycled and rain waters
日産スタジアム NISSAN STADIUM (36) Rain water collected in the roof is used to sprinkle the grass in the filed.
日産スタジアム NISSAN STADIUM (37) Treated sewage is used for flushing toilets and watering plants and greenery.
 Sprinkler

日産スタジアム NISSAN STADIUM (39)

Measures to prevent sound leakage
日産スタジアム NISSAN STADIUM (40) Stainless steel roof specially designed for absorbing sound.
日産スタジアム NISSAN STADIUM (41) RC sound-absorbing wall (5F)
日産スタジアム NISSAN STADIUM (42) A sound-absorbing curtain may be installed during events.
 Roof

Overview

It took 2 years and 2 months for design and 3 years and 9 months for construction to complete this world-class stadium. The pillars, beams and floors were manufactured in 24 different plants throughout Japan, and were assembled at the construction site in less time using new technologies. The total cost was about 60.3 billion yen.
Designing period August 1991 - October 1993
Construction period January 1994 - October 1997
Inauguration March 1, 1998
Total cost 60.3 billion yen
Construction Surface area 164,054 m2
Building area 68,313 m2
Total floor area 172,758 m2
Structure Pre-cast, pre-stressed concrete PC compression method
Seven stories above ground
Height 51.96m at the highest point, 43.86m at the eaves
Roof Steel structure (solid truss structured steel pipes finished with zinc plating) (Covers 3/4 of the spectator seats)
Spectator seats Two tiers, 72,327 seats (all sectioned)
- Lower Stand (4th and 5th floor) - 34,371 seats
- Upper Stand (6th and 7th floor) - 37,956 seats
Space for wheelchairs 147 permanent seats, extra 485 seats to be converted if necessary
Field Certification First-class track approved by the Japan Track and Field Association
Track 400m, 9 lanes
Grass field Natural grass (107 x 72m)
Grass type Tifton 419 (summer grass), Perennial rye grass (winter grass)
Equipment for the grass Hot water pipes installed 30cm under the grass floor
Surrounding of the ground 2.5m wide ditch to impede rushing onto the ground (5m long, 3m deep) (separates the ground from the spectator seats)
Facilities for spectators Elevators Inside the stadium (from 4th to 7th floor): 4 elevators, capacity: 20 people
Outside the stadium (from 1st to 4th floor): 4 elevators, capacity: 20 people
3 staff elevators (capacity: 20, 15 and 11 people respectively)
Toilets 50 locations inside the stadium (378 units for men, 406 for women)
Electrical equipments Receiving system 66kv loop system
Transformer capacity 6,000kvA
Contracted energy eREX Co. 3,700kw Power supplied from the garbage incineration plant 1,100kw (Energy supplied from the incineration of garbage. It reaches the stadium through the tunnel cable of the Yokohama Municipal Subway line 3.)
Emergency supply Emergency electricity generator 2,000kvA
Air conditioning equipments Air conditioning system Single duct system, Air-cooling heat pump package
Heat supply City gas water cooler/heater, sewage heat pump chiller, and other thermal storage tanks
Sanitary equipments Cold water supply Drinkable water, water for various uses (Recycled wastewater treated in the Kohoku Wastewater Treating Plant is used for field sprinkling, flushing toilets and watering plants.)
Hot water supply Water heater using city gas (central hot water supply system) Electrical heater (locally)
Special equipment Air running hi-vision camera 1 unit (above the Main Stand)
Large screens 2 units (one on each Side stand, size 19m x 9m)
Lightings for sports games 824 lamps In football, the average lighting of the field is approx. 1,500-lux, 2,000-lux in front of each goal.
Sound equipment 528 speakers
Rain protection Movable roof (total width 143m, movable part 93m, length 5.5m)

Design management by Matsuda-Hirata / Tohata Architecture Office joint venture


Contractors for the construction
Construction Area (1) / Field construction Takenaka / Nara Construction joint venture
Construction Area (2) Zenidaka / Nippon Tubing Construction joint venture
Construction Area (3) Nippon Kokudo / Watanabe Construction joint venture
Construction Area (4) Sato / Miki Construction joint venture
Artificial foundation (1) Miki / Watanabe Construction joint venture
Artificial foundation (2) Takenaka / Suruga Construction joint venture
Electricity Kinden / Kyoeisha Construction joint venture
Air conditioning Shinnikku / Osawa Construction joint venture
Sanitation facilities Kawamoto / Yamamoto Electricity and Water Works Construction joint venture
Elevators (1) Daiko
Elevators (2) Schindler Elevators
Large screens Toshiba Lighting and Technology Corp.
Spectator seats (1) Kotobuki
Spectator seats (2) Kokuyo
Development of field foundation Taisei Rotec
Development of field surface Nippon Taiiku Shisetsu
Preparation of field grass Sakata no Tane
日産スタジアム NISSAN STADIUM (2024)
Top Articles
Effiziente Methoden, um Text zu PDF hinzuzufügen
Die besten kostenlosen PDF-Ersteller für mühelose Dokumentenkonvertierung
Mickey Moniak Walk Up Song
3 Tick Granite Osrs
Use Copilot in Microsoft Teams meetings
Zabor Funeral Home Inc
Avonlea Havanese
Repentance (2 Corinthians 7:10) – West Palm Beach church of Christ
Tesla Supercharger La Crosse Photos
80 For Brady Showtimes Near Marcus Point Cinema
Toyota Campers For Sale Craigslist
Mr Tire Prince Frederick Md 20678
Fototour verlassener Fliegerhorst Schönwald [Lost Place Brandenburg]
Max 80 Orl
Gt Transfer Equivalency
Athens Bucket List: 20 Best Things to Do in Athens, Greece
Zürich Stadion Letzigrund detailed interactive seating plan with seat & row numbers | Sitzplan Saalplan with Sitzplatz & Reihen Nummerierung
Craigslist Edmond Oklahoma
Paychex Pricing And Fees (2024 Guide)
Roof Top Snipers Unblocked
Vanessawest.tripod.com Bundy
Barber Gym Quantico Hours
Keci News
Regal Amc Near Me
Hdmovie2 Sbs
Turbo Tenant Renter Login
Tuw Academic Calendar
Water Temperature Robert Moses
Pacman Video Guatemala
Tinyzonehd
Viduthalai Movie Download
Issue Monday, September 23, 2024
Shauna's Art Studio Laurel Mississippi
APUSH Unit 6 Practice DBQ Prompt Answers & Feedback | AP US History Class Notes | Fiveable
Craigslist Central Il
Slv Fed Routing Number
Compress PDF - quick, online, free
Covalen hiring Ai Annotator - Dutch , Finnish, Japanese , Polish , Swedish in Dublin, County Dublin, Ireland | LinkedIn
Naya Padkar Newspaper Today
Why Gas Prices Are So High (Published 2022)
Finland’s Satanic Warmaster’s Werwolf Discusses His Projects
Compare Plans and Pricing - MEGA
Taylor University Baseball Roster
World Social Protection Report 2024-26: Universal social protection for climate action and a just transition
Union Corners Obgyn
Pulitzer And Tony Winning Play About A Mathematical Genius Crossword
Vintage Stock Edmond Ok
What is 'Breaking Bad' star Aaron Paul's Net Worth?
Rite Aid | Employee Benefits | Login / Register | Benefits Account Manager
Hkx File Compatibility Check Skyrim/Sse
Black Adam Showtimes Near Cinemark Texarkana 14
Heisenberg Breaking Bad Wiki
Latest Posts
Article information

Author: Edmund Hettinger DC

Last Updated:

Views: 6489

Rating: 4.8 / 5 (78 voted)

Reviews: 85% of readers found this page helpful

Author information

Name: Edmund Hettinger DC

Birthday: 1994-08-17

Address: 2033 Gerhold Pine, Port Jocelyn, VA 12101-5654

Phone: +8524399971620

Job: Central Manufacturing Supervisor

Hobby: Jogging, Metalworking, Tai chi, Shopping, Puzzles, Rock climbing, Crocheting

Introduction: My name is Edmund Hettinger DC, I am a adventurous, colorful, gifted, determined, precious, open, colorful person who loves writing and wants to share my knowledge and understanding with you.